Retrofit & Modernization

Replacing obsolete controls, drives and HMIs in planned shutdowns, without losing what the line already does well.

00

Solution

Lifecycle

Retrofit & Modernization

Replacing obsolete controls, drives and HMIs in planned shutdowns, without losing what the line already does well.

Control architecture drawing of three packaging lines after PLC migration

FIG. 1

Illustrative application drawing · see the linked project record

SOL-10

01

Problem & outcome

What it solves

01

Problem & outcome

What it solves

The problem

A line can be mechanically sound and still be one failed CPU away from a long stop. Obsolete controls, unavailable spares and knowledge held by one person are risks that grow quietly until they don't.

The problem

A line can be mechanically sound and still be one failed CPU away from a long stop. Obsolete controls, unavailable spares and knowledge held by one person are risks that grow quietly until they don't.

Intended outcome

Intended outcome

Supported controls, recovered documentation and a line that restarts at rate after each cutover.

Typical cutover

24–72 h per line

Indicative range · confirmed per project

Typical cutover

24–72 h per line

Indicative range · confirmed per project

02

Engineering

Approach, applications and scope

02

Engineering

Approach, applications and scope

Technical scope

Engineering approach

We start with an audit of hardware, software and documentation, then plan the migration in phases that fit your shutdown windows. New panels are pre-wired and the converted logic is tested in simulation before each cutover.

Typical applications

  • Legacy PLC, drive and HMI replacement

  • Safety reassessment after controls change

  • Documentation recovery

  • Phased line upgrades

Scope

  • Obsolescence audit and migration plan

  • Logic conversion and simulation testing

  • Pre-wired panels and cutover plan

  • Training and support handover

Technical scope

Engineering approach

We start with an audit of hardware, software and documentation, then plan the migration in phases that fit your shutdown windows. New panels are pre-wired and the converted logic is tested in simulation before each cutover.

Typical applications

  • Legacy PLC, drive and HMI replacement

  • Safety reassessment after controls change

  • Documentation recovery

  • Phased line upgrades

Scope

  • Obsolescence audit and migration plan

  • Logic conversion and simulation testing

  • Pre-wired panels and cutover plan

  • Training and support handover

Talk to an engineer

Request a retrofit assessment

An engineer replies within one business day.

Talk to an engineer

Request a retrofit assessment

An engineer replies within one business day.