Vectron was founded in 2009 by controls engineers who had spent years commissioning other people’s machines. They saw that most automation problems were specification problems rather than robot problems: systems built before anyone had written down what they had to do.
The company has grown to about 70 people, but works the same way. We write down what a system must do before choosing the hardware, test logic against a simulation before it reaches the floor, and run factory acceptance with your own operators.
When a measured result misses its specification, the commissioning record says so — and shows how it will be closed. We stay with installed systems through support, and we take over systems built by others.
01
Robotics & handling
Cell design, reach and cycle simulation, gripper engineering, robot programming and safety configuration.
02
Controls, HMI & SCADA
PLC and safety-PLC engineering to a written standard, operator screens, alarm management, supervisory systems.
03
Machine vision & inspection
Feasibility on real samples, optics and lighting, defect libraries and challenge-set testing.
04
Networking & production data
Network segmentation, OPC UA / MQTT connectivity, historians, OEE and downtime reporting.
05
Electrical design & panel building
Schematics, panel design and in-house build with pre-wiring for planned cutovers.
06
Service & support
Remote and on-site support, backups, health checks and modernization planning.
- 01Survey1–3 weeks
- 02Specify2–4 weeks
- 03Engineer4–10 weeks
- 04Build4–12 weeks
- 05FAT2–5 days
- 06Install1–3 weeks
- 07SAT1–4 weeks
- 08SupportOngoing
ENG-01
Pieter van Loon
Managing Director
Management
ENG-02
Anneke Dijkstra
Engineering Director
Engineering
ENG-03
Tomasz Wróbel
Robotics Lead
Robotics
ENG-04
Sanne Verbeek
Controls Lead
Controls
ENG-05
Rahul Menon
Vision Lead
Machine Vision
ENG-06
Lotte Hendriks
Project Delivery Manager
Project Delivery
ENG-07
Marco Bianchi
Service Lead
Service & Support
Every system leaves with its documentation, software backups and a named support contact. Support agreements set response times, health checks and spare-parts advice; systems built by other integrators can be taken over after an audit.