00
Industry
IND-07
Warehousing & Logistics
Material flow between production and dispatch: conveying, palletizing, transfer and the controls that tie them together.
00
Industry
Warehousing & Logistics
Material flow between production and dispatch: conveying, palletizing, transfer and the controls that tie them together.
01
Production context
What we see on these lines
01
Production context
What we see on these lines
Industry context
Between the end of production and the loading dock, material is conveyed, accumulated, palletized, wrapped, labelled and stored. In many plants this flow grew in stages and is now the limiting factor for dispatch.
We engineer material-handling systems inside and next to production — conveying, palletizing, AMR and pallet transfer — and integrate them with the site's warehouse management system.
Industry context
Between the end of production and the loading dock, material is conveyed, accumulated, palletized, wrapped, labelled and stored. In many plants this flow grew in stages and is now the limiting factor for dispatch.
We engineer material-handling systems inside and next to production — conveying, palletizing, AMR and pallet transfer — and integrate them with the site's warehouse management system.
Common challenges
Accumulation and congestion between production and dispatch.
Forklift traffic in pedestrian areas.
Manual labelling and scanning that breaks the link between product and pallet data.
Peak volumes that the current layout cannot absorb.
Common challenges
Accumulation and congestion between production and dispatch.
Forklift traffic in pedestrian areas.
Manual labelling and scanning that breaks the link between product and pallet data.
Peak volumes that the current layout cannot absorb.
02
Relevant applications
Solutions used in this industry
02
Relevant applications
Solutions used in this industry
03
Engineering considerations
Standards and design constraints
03
Engineering considerations
Standards and design constraints
Standards & considerations
Throughput modelling of the full flow before equipment is specified.
Safe separation of automated transport, forklifts and pedestrians.
Interfaces to WMS/ERP for pallet labels and dispatch data.
Phased installation while dispatch continues.
Standards & considerations
Throughput modelling of the full flow before equipment is specified.
Safe separation of automated transport, forklifts and pedestrians.
Interfaces to WMS/ERP for pallet labels and dispatch data.
Phased installation while dispatch continues.
04
Evidence
Project records
04
Evidence
Project records
No published project record yet
Comparable work is not always published. Ask an engineer about similar applications.
05
Resources
Technical notes for this industry
05
Resources
Technical notes for this industry
Your production environment
Discuss your Warehousing & Logistics project.
An engineer replies within one business day.
Your production environment
Discuss your Warehousing & Logistics project.
An engineer replies within one business day.