Tier-1 and tier-2 assembly, where takt time, traceability and change control decide whether automation is accepted on the line.

00

Industry

Automotive & Mobility

Tier-1 and tier-2 assembly, where takt time, traceability and change control decide whether automation is accepted on the line.

01

Production context

What we see on these lines

01

Production context

What we see on these lines

Industry context

Our automotive work is with tier-1 and tier-2 suppliers producing brake, steering, seating and powertrain sub-assemblies. Lines run to fixed takt times, usually between 4 and 60 seconds, and every part leaves with a record of how it was built.

Most projects are additions to running lines: a vision check, a robotic joining station, a traceability layer or a controls upgrade that must fit an existing station layout and the customer's PPAP and change-control process.

Industry context

Our automotive work is with tier-1 and tier-2 suppliers producing brake, steering, seating and powertrain sub-assemblies. Lines run to fixed takt times, usually between 4 and 60 seconds, and every part leaves with a record of how it was built.

Most projects are additions to running lines: a vision check, a robotic joining station, a traceability layer or a controls upgrade that must fit an existing station layout and the customer's PPAP and change-control process.

Common challenges

  • Escaped defects that only show up at the OEM, with every complaint costing far more than the part.

  • Traceability gaps between part serial numbers and process data such as torque, press force or test results.

  • Takt pressure — new checks must fit inside the existing cycle, not add to it.

  • Model changeover across many variants on one line, with error-proofing for each.

Common challenges

  • Escaped defects that only show up at the OEM, with every complaint costing far more than the part.

  • Traceability gaps between part serial numbers and process data such as torque, press force or test results.

  • Takt pressure — new checks must fit inside the existing cycle, not add to it.

  • Model changeover across many variants on one line, with error-proofing for each.

02

Relevant applications

Solutions used in this industry

02

Relevant applications

Solutions used in this industry

03

Engineering considerations

Standards and design constraints

03

Engineering considerations

Standards and design constraints

Standards & considerations

  • Customer-specific requirements for traceability data retention and part marking (data matrix code quality).

  • Safety integration to EN ISO 13849 performance levels agreed with the plant safety engineer.

  • Change control: every software change versioned, documented and approved before it reaches production.

  • Line-side data must reach the plant MES in the format the OEM audit expects.

Standards & considerations

  • Customer-specific requirements for traceability data retention and part marking (data matrix code quality).

  • Safety integration to EN ISO 13849 performance levels agreed with the plant safety engineer.

  • Change control: every software change versioned, documented and approved before it reaches production.

  • Line-side data must reach the plant MES in the format the OEM audit expects.

Your production environment

Discuss your Automotive & Mobility project.

An engineer replies within one business day.

Your production environment

Discuss your Automotive & Mobility project.

An engineer replies within one business day.

Create a free website with Framer, the website builder loved by startups, designers and agencies.