01
Who should use it
Production, engineering or operations leads with a line, a problem or a new project in mind.
02
Useful to have
Rates, product range, current process, shutdown windows and any drawings you can link.
03
Technical details are optional
Step 3 is entirely optional. Share what you know; we will ask about the rest.
04
What happens next
An engineer reviews the brief, then a 30-minute technical call, then a site survey or proposal.