PLC migration readiness checklist

Twenty-four checks to complete before you schedule a controls migration on a running line.

00

Checklist

PLC migration readiness checklist

Twenty-four checks to complete before you schedule a controls migration on a running line.

Type

Checklist

Topic

Retrofit & modernization

Published

May 4, 2026

Access

Read online

Hardware and software

  • Inventory of every CPU, I/O module, drive and HMI, with firmware versions

  • Current program backups, verified to match what is running

  • Source code with comments, or confirmation that none exists

  • Licences for current engineering software

  • List of networked devices and addresses

  • Spare-parts stock and supplier status for each component

Documentation

  • Electrical drawings checked against the installed panel

  • Safety function list and most recent risk assessment

  • Interface list to upstream and downstream machines

  • Recipe and format data, with owner

Operations

  • Available shutdown windows for the next 12 months

  • Acceptable restart rate after cutover

  • Operators and technicians available for training

  • Known faults and workarounds collected from operators

  • Current downtime and MTTR baseline

Migration plan

  • Target platform agreed with maintenance and IT

  • Coding standard agreed

  • Simulation approach for logic testing

  • Panel pre-wiring and FAT plan

  • Cutover sequence with go/no-go points

  • Fallback plan if cutover fails

  • Safety reassessment scope

  • Documentation deliverables agreed

  • Support arrangement after go-live

Preparing a project?

Bring your requirements. An engineer will help shape the specification.

An engineer replies within one business day.

Preparing a project?

Bring your requirements. An engineer will help shape the specification.

An engineer replies within one business day.

Create a free website with Framer, the website builder loved by startups, designers and agencies.