The formula
Unattended time = parts in buffer per machine × cycle time per part.
Cycle time per part = machining time + robot load/unload time (when the machine waits for the robot).
Worked example
Machining time: 250 s
Robot load/unload: 38 s → cycle 288 s
Buffer: 140 blanks shared by 2 machines → 70 per machine
Unattended time: 70 × 288 s = 20,160 s = 5.6 h
Things that reduce real autonomy
Gauge-triggered stops when tolerances drift
Chip build-up on grippers or fixtures
Tool life shorter than the unattended period
Coolant level and chip conveyor capacity
Practical advice
Match tool life and chip capacity to the buffer before adding more buffer. A larger drawer system is of little use if a tool wears out after three hours.