Project

PRJ-0312

Industry

Food & Beverage

Application

End-of-line palletizing

Commissioned

Nov 14, 2025

Status

Commissioned

Line output raised from 900 to 1,200 cases/h by removing manual palletizing as the constraint.

Project

PRJ-0312

Industry

Food & Beverage

Application

End-of-line palletizing

Commissioned

Nov 14, 2025

Status

Commissioned

Line output raised from 900 to 1,200 cases/h by removing manual palletizing as the constraint.

Plan drawing of the two-cell palletizing layout

FIG. 1

End-of-line palletizing

PRJ-0312

01

Commissioning results

Measured outcome

01

Commissioning results

Measured outcome

Line output

900

→

1,200

cases/h

12-week average after SAT · 2 shifts · same SKU mix

Line output

900

→

1,200

cases/h

12-week average after SAT · 2 shifts · same SKU mix

Manual palletizing positions

2

→

0

per shift

4 operators/day redeployed to line roles; no redundancies

Manual palletizing positions

2

→

0

per shift

4 operators/day redeployed to line roles; no redundancies

Cell availability

98.6

%

Rolling 90 days · palletizing cells only, upstream stops excluded

Cell availability

98.6

%

Rolling 90 days · palletizing cells only, upstream stops excluded

Simple payback

19

months

€410,000 installed ÷ €260,000 estimated annual benefit (client cost data)

Simple payback

19

months

€410,000 installed ÷ €260,000 estimated annual benefit (client cost data)

02

Engineering record

Challenge, approach and architecture

02

Engineering record

Challenge, approach and architecture

Challenge

Context. A bottling line producing 24 SKUs in 6- and 12-packs. Filling and case packing had been upgraded to 1,500 cases/h, but cases were still stacked by hand on two pallet positions.

Existing process. Two operators per shift stacked 10 cases per layer, 6 layers per pallet, at up to 900 cases/h. Output dropped late in each shift and on hot days, and lifting risk was the plant's top ergonomic finding.

Constraints.

  • No extension of the building; the cells had to fit the existing 14 × 9 m end-of-line area.

  • Installation within a 10-day summer shutdown.

  • Pattern changes by line operators, without robot programming.

Challenge

Context. A bottling line producing 24 SKUs in 6- and 12-packs. Filling and case packing had been upgraded to 1,500 cases/h, but cases were still stacked by hand on two pallet positions.

Existing process. Two operators per shift stacked 10 cases per layer, 6 layers per pallet, at up to 900 cases/h. Output dropped late in each shift and on hot days, and lifting risk was the plant's top ergonomic finding.

Constraints.

  • No extension of the building; the cells had to fit the existing 14 × 9 m end-of-line area.

  • Installation within a 10-day summer shutdown.

  • Pattern changes by line operators, without robot programming.

Engineering approach

We modelled case flow for the full SKU mix and found that one cell could not cover peaks with enough margin for pallet changes. The design uses two identical cells fed by a diverter, so either cell can run the whole line at reduced rate during maintenance.

Scope. Throughput model, layout and safety concept; two ABB palletizing robots with vacuum/clamp grippers; infeed conveyors, diverter and accumulation; pallet dispensers; line PLC on Siemens S7-1500; pattern editor on the HMI.

Patterns were built and tested on a full-scale mock-up in our integration hall before FAT.

Engineering approach

We modelled case flow for the full SKU mix and found that one cell could not cover peaks with enough margin for pallet changes. The design uses two identical cells fed by a diverter, so either cell can run the whole line at reduced rate during maintenance.

Scope. Throughput model, layout and safety concept; two ABB palletizing robots with vacuum/clamp grippers; infeed conveyors, diverter and accumulation; pallet dispensers; line PLC on Siemens S7-1500; pattern editor on the HMI.

Patterns were built and tested on a full-scale mock-up in our integration hall before FAT.

System architecture

  • Line control: one S7-1500 safety PLC for both cells, conveyors and pallet handling, PROFINET to robots and drives.

  • Robots: two 4-axis palletizing robots, 180 kg payload, each with a dedicated pallet exit.

  • Safety: fenced cells, muted light curtains on pallet exits, safety laser scanner at the operator pallet station.

  • Data: cell state, cycle and fault data to the plant historian via OPC UA.

System architecture

  • Line control: one S7-1500 safety PLC for both cells, conveyors and pallet handling, PROFINET to robots and drives.

  • Robots: two 4-axis palletizing robots, 180 kg payload, each with a dedicated pallet exit.

  • Safety: fenced cells, muted light curtains on pallet exits, safety laser scanner at the operator pallet station.

  • Data: cell state, cycle and fault data to the plant historian via OPC UA.

Deployment & commissioning

FAT ran over three days with the client's operators, using production cases. Installation and commissioning took 9 of the 10 shutdown days; ramp-up to full rate took two weeks.

One item remained open at SAT: pattern changeover averaged 12 minutes against a 10-minute specification. The cause is the manual slip-sheet magazine change; a second magazine is scheduled.

Deployment & commissioning

FAT ran over three days with the client's operators, using production cases. Installation and commissioning took 9 of the 10 shutdown days; ramp-up to full rate took two weeks.

One item remained open at SAT: pattern changeover averaged 12 minutes against a 10-minute specification. The cause is the manual slip-sheet magazine change; a second magazine is scheduled.

  1. INInfeedCases from case packer
  2. DIVDiverterSplit to cell A / B
  3. ROBPalletize10 cases per layer
  4. EXITPallet exitMuted light curtain
  5. WRAPStretch-wrapLabel and dispatch
FIG. 3 · Signal path · Rev A

03

Specification & results

Specification, acceptance and results

03

Specification & results

Specification, acceptance and results

Cells

Identical, either cell can run the line

2

Cells

Identical, either cell can run the line

2

Robot payload

4-axis palletizing robot

180 kg

Robot payload

4-axis palletizing robot

180 kg

Pattern

60 cases per pallet

10 cases/layer · 6 layers

Pattern

60 cases per pallet

10 cases/layer · 6 layers

Footprint

Within existing end-of-line area

14 × 9 m

Footprint

Within existing end-of-line area

14 × 9 m

Controller

PROFINET / PROFIsafe

Siemens S7-1500F

Controller

PROFINET / PROFIsafe

Siemens S7-1500F

Parameter

Specified

Measured

Result

Layer cycle time

≤ 34 s

31 s

Pass

Layer cycle time

Specified

≤ 34 s

Measured

31 s

Result

Pass

Two-cell capacity

≥ 1,500 cases/h

2,322 cases/h

Pass

Two-cell capacity

Specified

≥ 1,500 cases/h

Measured

2,322 cases/h

Result

Pass

Pattern recognition

≥ 99.5 %

99.8 %

Pass

Pattern recognition

Specified

≥ 99.5 %

Measured

99.8 %

Result

Pass

Pattern changeover

≤ 10 min

12 min

Open item

Pattern changeover

Specified

≤ 10 min

Measured

12 min

Result

Open item

Results

Measure

Before

After

Line output

900 cases/h

1,200 cases/h

Constraint

Manual palletizing

Filler

Palletizing operators

2 per shift

None (redeployed)

Pattern change

Paper instruction

HMI recipe

Each cell is capable of about 1,160 cases/h (10 cases per 31 s layer), so two cells provide 2,322 cases/h against a 1,500 cases/h specification. The line is now limited by the filler, not by palletizing.

Estimated annual benefit of €260,000 = 2 operators × €34/h × 8 h × 2 shifts × 250 days (€272,000), less €12,000 annual maintenance.

Results

Measure

Before

After

Line output

900 cases/h

1,200 cases/h

Constraint

Manual palletizing

Filler

Palletizing operators

2 per shift

None (redeployed)

Pattern change

Paper instruction

HMI recipe

Each cell is capable of about 1,160 cases/h (10 cases per 31 s layer), so two cells provide 2,322 cases/h against a 1,500 cases/h specification. The line is now limited by the filler, not by palletizing.

Estimated annual benefit of €260,000 = 2 operators × €34/h × 8 h × 2 shifts × 250 days (€272,000), less €12,000 annual maintenance.

04

Drawings

Layout and detail drawings

Original technical drawings prepared for this record. Illustrative, not to scale.

04

Drawings

Layout and detail drawings

Original technical drawings prepared for this record. Illustrative, not to scale.

Plan drawing of the two-cell palletizing layout

FIG. 1 · Two-cell palletizing, plan view

Layer pattern study, 10 cases per layer

FIG. 2 · Layer patterns, 10 cases per layer, 6 layers

The palletizer stopped being the conversation in the morning meeting. Now we talk about the filler.

Operations Manager

Client · beverage producer (anonymized)

PRJ-0312

05

Related

Solutions, platforms and resources

05

Related

Solutions, platforms and resources

A

Related solutions

B

Technology stack

C

Related resource

Have a similar application?

Discuss a palletizing project

An engineer replies within one business day.

Have a similar application?

Discuss a palletizing project

An engineer replies within one business day.

Create a free website with Framer, the website builder loved by startups, designers and agencies.